Crews to wait until after Thanksgiving to complete airport tunnel repaving

The Quick Take
Reid airport officials considered closing traffic lanes in the Airport Connector tunnel for a repaving project, but now all lanes will stay open during the holiday.
Ground Level News aggregates headlines from public feeds. This page shows a short summary only; the full article and all rights belong to Las Vegas Review-Journal.
Related
Local
Famed Marine Corps veteran under federal investigation over undisclosed allegations - The Edwardsville Intelligencer
Local
Some vetoed bills may be coming back to Carson City
Gov. Joe Lombardo rejected a record number of bills sent to him by the Democrat-controlled Nevada Legislature — 161 bills over two sessions.
Local
Ahead of first scrimmage, Vegas Vanguards rookie class is already turning heads
Tessa Janecke has yet to play a PWHL game, but the Vegas Vanguards’ third overall pick is already establishing herself as a team leader.
Local
Pipe mounted to fire ladder breaks away with firefighter at top
A water-carrying pipe and nozzle mounted to a ladder on a St. Louis Fire Department truck broke away Saturday night while a firefighter was at the top of the…
