# U.S. Shipbuilding Delays Push Empire Wind’s First Power Into 2027

- Source: gCaptain (shipping)
- Published: 2026-10-29T16:39:42+00:00
- Category: World
- Original: https://gcaptain.com/u-s-shipbuilding-delays-push-empire-winds-first-power-into-2027/
- Canonical: https://groundlevelnews.com/story/u-s-shipbuilding-delays-push-empire-wind-s-first-power-into-2027-2bb48e/

Delays involving U.S.-built support vessels have pushed back turbine installation at Equinor’s Empire Wind offshore wind project off New York, with first power now expected in the first half of...

_Ground Level News shows a short summary only; the full article and all rights belong to gCaptain (shipping)._
