# UAD 3.6 is coming. Hybrid appraisals are built for it.

- Source: HousingWire
- Published: 2026-10-27T07:00:00+00:00
- Category: Local
- Original: https://www.housingwire.com/articles/uad-3-6-hybrid-appraisals-2/
- Canonical: https://groundlevelnews.com/story/uad-3-6-is-coming-hybrid-appraisals-are-built-for-it-c73ef4/

GSE exception allows UAD 2.6 through May 19, 2027, but rep and warranty protections drop starting March 1, 2027

_Ground Level News shows a short summary only; the full article and all rights belong to HousingWire._
